      玻璃鋼防腐管道安裝要求
      時間:2022-07-05  瀏覽:5572次

        Requirements for installation of FRP pipes

        1、玻璃鋼防腐管道在安裝前應對設備管口、預埋件、預留孔洞、鋼結構等涉及管道安裝的內容進行復核。

        1. Before installation, the pipeline shall check the contents concerning the installation of the pipeline, such as the nozzle of the equipment, the embedded parts, the reserved holes and the steel structure.

        2、管道的坡度應按圖紙的要求進行調整,調整方法可以利用支座達到坡度要求,焊縫應設置在便于檢修、觀察的地方。

        2. The gradient of the pipeline should be adjusted according to the requirements of the drawings. The adjusting method can use the support to meet the gradient requirements. The welding seam should be set in a place convenient for maintenance and observation.

        3、與傳動設備連接的管道,安裝前內部要處理干凈,焊接固定管口一般應遠離設備,以避免焊接產生應力對傳動設備安裝精度的影響。

        3. The pipeline connected with the transmission equipment should be cleaned before installation, and the fixed pipe mouth should be far away from the equipment to avoid the influence of welding stress on the installation accuracy of the transmission equipment.

        4、管道與機器連接前,應防止強力相對,在自由狀態下檢查法蘭的平行度和同軸度。

        4. Before connecting the pipe with the machine, the relative strength should be prevented, and the flange's parallelism and coaxiality should be checked under the free state.

        5、安全閥應垂直安裝,在投入試運行時,要及時調校安全閥。安全閥的調校在系統上進行,開啟和回座壓力要符合設計文件的規定。

        5, the safety valve should be installed vertically, and the safety valve should be adjusted in time for commissioning. The final adjustment of the safety valve is carried out on the system, and the opening and returning pressure must conform to the design documents.

        6、閥門安裝前,按設計文件核對其型號,并按介質流向確定其安裝方向。當閥門與管道以法蘭或螺紋方式連接時,閥門應在關閉狀態下安裝;如以焊接方式安裝時,閥門不得關閉。

        6. Before installing the valve, check its model according to the design document and determine its installation direction according to the medium flow direction. When the valve and pipe are flanged or threaded, the valve shall be installed in a closed state; if installed in a welded way, the valve shall not be closed.

        7、儀表元件的臨時替代:所有儀表元件安裝時,均采用臨時元件替代,等試壓、沖洗、吹掃工作結束后,投料前再正式安裝。

        7. Temporary substitution of instrument components: All instrument components are installed with temporary components, and are formally installed before feeding after pressure test, flushing and purging.


      主站蜘蛛池模板: 国产做受| 深夜爽爽动态图无遮无挡| xxxx交换夫妇com| 久久不见久久见免费视频7| 亚洲午夜无码毛片av久久京东热| av在线观看免费网站| 国产,精品,无码,丝袜| 国产美女精品一区| 天天爽夜夜爱| av中文字幕播放| 99视频精品在线| 麻豆国产成人av在线播放| 99久久综合狠狠综合久久| 国产大陆亚洲精品国产| 鹤岗市| 伊人综合夜夜操| 黄色av电影| 亚洲天堂av中文字幕| 久久久中文字幕日本无吗| 99热国产精品| 国产精品无码久久久久久| 日韩a视频| 男公厕里同性做爰| 国产成人艳妇aa视频在线| 少妇免费毛片久久久久久久久 | 福利色导航| 久操国产在线| 精品国产麻豆免费人成网站| 色www88| 性一交一无一伦一精一品| 超级乱淫aⅴ片免费| 九九国产| 久久丁香五月天综合网| 四季av一区二区| 一本久道综合在线无码88| 中文字幕av一区二区三区 | 欧美日本日韩aⅴ在线视频| 日本一区二区三区中文字幕| 安化县| www.亚洲成年人网站| 久久99国产精品尤物|